Connectivity plan moves forward

 

Connectivity plan moves forward

 

Date: March 18, 2010
by: Robin Roy | City Editor

 
 

After hearing that the cost of doing only road resurfacing on the stretch of U.S. 41 from 14th Street to Osprey Avenue would still be at least $7 million, the Sarasota City Commission unanimously voted to back the bayfront-connectivity plan.

That commitment to connect downtown to the bayfront brings with it six controversial roundabouts to be placed on U.S. 41.

Before it moved ahead with its plans, city staff asked the commission to reaffirm that it backs the plan, which calls for slower speed limits, narrower car lanes, wider, landscaped medians, greater pedestrian compatibility and six roundabouts from 14th Street to Orange Avenue. The entire connectivity project will stretch south to Osprey Avenue.

“We’re not just trying to get people across the street,” said project Manager Steve Stancel. “We’re trying to change the character of U.S. 41.”

The city’s consultant explained the advantages of the plan. The elimination of stop-and-go cars at traffic lights through the area would save drivers more than $13,000 in gas each year, reduce vehicle emissions by up to 30% and reduce traffic delays by up to 82%, according to Jason Collins, of Trans Associates.

Commissioners also voted to allocate $5.9 million to build the first two U.S. 41 roundabouts at 14th Street and 10th Street.

Collins told them that at some point, traffic-signal improvements in that same stretch of roadway would cost $4.7 million, and road resurfacing in the entire area from 14th Street to Osprey Avenue would cost the city $7 million even if it decided not to build the roundabouts.

“This is a historic moment for Sarasota,” said Rod Warner, a roundabout proponent and connectivity chairman of the The City Alliance. “When bayfront connectivity gets real.”

The city hopes the roundabout at 10th Street will help take some of the traffic volume off U.S. 41 by directing cars downtown via Lemon Avenue.

Vice Mayor Kelly Kirschner questioned whether the 10th Street roundabout would make it more difficult for boaters to get to the boat ramp.

Collins said the roundabout will actually make things easier, because it calls for direct access to the boat ramp north of 10th Street. Northbound traffic will have a long turn lane after the roundabout, and southbound traffic will be able to turn directly into the ramp’s parking lot.

“Currently, 10th Street is a tight turn,” said Collins. “(The connectivity plan) will be more facilitative and safer.”

The first two roundabouts could be complete in three years. The rest of the bayfront-connectivity project could take up to 20 years to finish.

Contact Robin Roy at rroy@yourobserver.com.

SHARE
Login Register now

Currently 1 Response

  • 1.
  • When you can retain a roadway’s ability to move through high volume with at least the same travel time (which this does) and do it with so much less risk to life and limb, this plan using roundabouts-in- series is the way to go. Tourists will be thankful … just as tourists are when skiing in Colorado or golfing at Hilton Head. Seniors will be thankful too and ask for more roundabouts as Seniors do in every city that has introduced modern roundabouts.
  •  
  • Rod Warner
    Fri 19th Mar 2010
    at 9:51am
Login below to post a comment or click register.
Account E-Mail
Password
forgot password? click here
Speak Your Mind Below!

Classifieds

YourObserver
Subscribe to our eNewsletters
1970 Main Street, Sarasota, FL 34236 941-366-3468

Copyright 2014 The Observer Group Inc., All Rights Reserved